• ×   Pasted as rich text.   Paste as plain text instead

      Only 75 emoji are allowed.

    ×   Your link has been automatically embedded.   Display as a link instead

    ×   Your previous content has been restored.   Clear editor

    ×   You cannot paste images directly. Upload or insert images from URL.

  • Member Statistics

    27603
    Total Members
    6254
    Most Online
    cwbhunter
    Newest Member
    cwbhunter
    Joined
  • Similar Content

    • By GCCISarah
      Has anyone found how to re-name their Camera Callout Labels in X12? For example, my cameras are set up with a Callout Label of "C1, C2, C3..." etc etc. This is by way of some default setting that I cannot seem to find. Each new camera automatically labels and numbers itself in succession as noted above. However, I have decided I'd like name all of my future Full Cameras as "P1, P2, P3... " in a new plan. 
      Except for opening each individual camera to change the Callout Label, I cannot find a setting to change this default to start with a "P" and automatically number itself from there! It seems to be missing from the Full Camera Defaults page.. You CAN set a default for "Text Below Line" but not for the Callout Label itself for cameras?
       
       
    • By dskogg
      I want to show a window schedule for each elevation only showing the windows on that elevation, what is the best way to do this?
      This way i can show the sq footage of windows on that wall exposure and have it totaled in the schedule for just that wall.
    • By robdyck
      There must be a way to alter or control the vertical spacing of schedules. I've included the exterior elevation view of windows in my schedule, and there's a lot of wasted space between each row.
      Does anyone know if that can be adjusted?

    • By cjanderson66
      I seem to be having a problem that I am at my wits end with.  It appears that my plan is showing double callouts for all my windows and I can't seem to figure out how to get rid of them.  I have tried deleting my window schedule and then inserting it again but nothing.  Has anyone else had this issue before?
      Sosine NFP.pdf
    • By Sweeney
      Hey All, 
       
      Is there any way to include the jamb width in a door schedule? For example...
       
      Door Unit is a Marvin Clad Ultimate CUFD 3070 S LHIS
      Door Frame Size: 37 7/16" x 86"
      Door Jamb Size: 1 3/16"
       
      Door schedule shows the width as 35-1/16...**37-7/16" - (1-3/16 x 2)** and I want it to show 37-7/16
       
      Is there a macro I can edit to act more like the widow schedule preforms?
       
      Thanks is advance,
      Austin