-
Posts
9 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Posts posted by eraser82
-
-
I am trying to figure out the right order to building a padio with retaining walls and above ground railings.
In have my terrain set to automatic elevation and my ground floor set to -38". Not sure if that was the proper way to set up. Perhaps this is the source of my problems?
Thanks for any help!
Sub Basement - Building Out A Submerged Padio
in General Q & A
Posted
No, thank you - the hole action was a perfect fix,
because the 'padio' is not considered a foundation object the land was not deforming around it,
cutting a whole was the perfect solution.